1.800.833.7958

 

sales@geotechenv.com

Español

中文

 

Geotech PRS (Product Recovery System)

The Geotech PRS is a product recovery system that incorporates a pneumatic control panel with a downwell stainless steel pneumatic bladder pump coupled with a unique floating skimmer attachment. The skimmer attachment consists of an oleophilic/hydrophobic buoy that allows free floating product to be skimmed down to a sheen.

  • Available for 2" (5cm) or larger diameter wells.
  • Control unit has dual timers to alternate the pressurization and venting of the pump.
  • Tankfull Shut-Off Sensor, with indicator and manual reset.
  • Designed for field portability and rapid installation.
  • Bladder designed for easy field replacement (no tools required).
  • Operate multiple pumps from one control panel.
  • Different sizes/types of skimmers can be used with the standard pump for varying site conditions, including screened skimmers for extra protection.
  • High capacity pump available, for total fluids pumping.
Pump:    
Size   23.5" L x 1.75" O.D. (59.7cm L x 4.5cm O.D.)
Weight
  4.5 lbs. (2 kg)
Materials   303 and 304 stainless steel, flexible PVC and brass

Skimmer:   2" Model 4" Model
Effective Travel Range   12" (30.5cm) 24" (61 cm)
Size

With Optional Screen

  35.5" L x 1.75" O.D.
(90cm L x 4.5cm O.D.)
35.5" L x 1.88" O.D.
(90cm L x 4.7cm O.D.)
35.5" L x 3.75" O.D.
(90cm L x 9.5cm O.D.)
35.5" L x 3.83" O.D.
(90cm L x 9.7cm O.D.)
Weight
With Optional Screen
  1.75 lbs. (.8 kg)
3.0 lbs. (1.4 kg)
2.25 lbs. (1 kg)
4.5 lbs. (2 kg)
Operating Temperature   32° to 100°F (0° to 38°C)
Materials
304 stainless steel, Polyethylene, PVC, Polypropylene, brass
PRS Installation
Typical PRS Installation with Tankfull Shut-Off Sensor
The unique PRS skimmer incorporates both a density float and hydrophobic filter. The float follows water table fluctuations and places filter at the water/product interface. As the system cycles, product is drawn through the hydrophobic filter and transferred to a recovery tank.

Adobe® Reader® is required

> Specifications PDF

> Installation and Operation Manual

> Geotech Hydrocarbon Viscosity Test Kit User Manual
   (test kit shown below)
Geotech Hydrocarbon Viscosity Test Kit

 

 

 

 

 

Geotech PRS System
  Tankfull
Shut-Off
Sensor
Bladder
Pump
2"
Skimmer
4"
Skimmer
Optional
Screened
Skimmer
Assembly
2" Shown
PRS Controller
PRS Controller